Pacific Fair Epping

Epping
Completed
Commercial
EPRO Building Group
Pacific Fair Epping
Scope of Works
Pacific Fair Epping required a complex Main Switchboard upgrade, delivered within a live retail environment where maintaining continuous supply to the centre and its tenants throughout the works was a non-negotiable requirement.
Electrical scope:
- Full relocation of electrical services from the existing Main Switchboard to a new switch room, including fit-out of the room itself and set-out of its layout
- New consumer mains cabling and Type 2 sub-mains installed to support the new switchboard configuration
- Terminations completed across three existing transformers within the substation, with particular focus on accurate cable sizing and jointing
- Close coordination with the Distribution Network Service Provider (DNSP) and site stakeholders throughout planning and delivery
- Temporary generator connections managed to maintain continuous supply to the centre and its tenants during the transition
- A precisely staged cutover executed across five consecutive nights, minimising disruption to the live retail environment
A technically demanding upgrade delivered with rigorous planning and controlled execution, reflecting JMP's capability delivering complex switchboard works within live, operational environments.